CT010 – 03/20/2020 Scope of Work: Trunk-Air Intake Structural Metal Plates Replacement
CT050 – 04/02/20223: Varius Inlet Duct Replacement of AHU
CT050.1 – 04/02/2023: Cleaning Paint inside ventilation trunk and air intake
CT050.5 – 08/02/2023: BW 8 Port, new man hole hatch-Overhauling of Chain Locker Ejector valve and rebuilding of its transmission valve shaft-Overhauling of Fore Peak Bulkhead valve and overhauling of its transmission shaft (partially new fabricated)
CT50.8 – 10/02/2023 : Replacement Ceiling Casino’ office
Safeguarding your structures. A specific care service.